Our Process

The same seven-stage process runs every job, from a single vanity top to a full commercial fit-out.

  1. 1

    Consultation

    Tell us what you're building — a kitchen, a lobby, a full fit-out — and what stage you're at. We scope the project and talk through material and budget options.

  2. 2

    Site Measure & Templating

    We visit site and take exact measurements, producing a template. Nothing gets cut until the template is confirmed against the actual space.

  3. 3

    Material Selection

    Choose slab, colour, and finish in person against your template — real stone under real light, not a swatch or a screen.

  4. 4

    Fabrication

    Cutting, edge profiling, and polishing happen in our own workshop, on our own equipment, by our own team.

  5. 5

    Dry-Lay

    Cut pieces are laid out dry before installation so seams and veining are confirmed while changes are still easy and cheap.

  6. 6

    Installation

    Our own installers fit the work on site — no subcontracted crews, no handoff risk between separate companies.

  7. 7

    Handover

    A final walkthrough, any snag items closed out, and care guidance specific to your material before we consider the job done.

Where the fabrication happens

Every stage from templating through fabrication is run out of our own workshop — the same team measures, cuts, and installs, so nothing gets lost in a handoff between separate contractors.

Ready to start with a site measure?

Tell us about your project and we'll arrange a visit.